Cryogenic integrity, on the record
The four controls the cold side keeps on the record.
An LNG plant carries its failure modes at temperatures that hide them. The platform puts each one on a named standard, with a module already built for the job.
02 layers · scroll to stack
011 / 2
Containment proven, tank by tank
intelliINSPECT schedules shell, floor, annular, and settlement inspections per tank, holding EN 1473 and ISO 16903 requirements against each outer containment. Walkdowns capture offline at the tank top and sign at closeout.
Cold piping with a remaining-life clock
intelliNDT logs UT and PAUT wall readings on cold piping and boil-off gas systems, computing corrosion rate and remaining life at capture rather than weeks later in a spreadsheet.
022 / 2
Risk sets the interval on the train
intelliINTEGRITY runs RBI intervals to API 580 and 581 and fitness for service to API 579 on liquefaction train pressure equipment, so the run, repair, or replace call carries its basis with it.
Fireproofing that meets the 59A review
intelliFIRE holds passive fire protection surveys against every fireproofed structure and pump platform, so an NFPA 59A review meets evidence instead of assumption.