Your team owns
- Equipment list authority and P&ID / historical workbook source files
- Approving staged ERP sync records and engineering calculation sign-offs
- Day-two form, checklist, and approval-chain edits in the workspace
Implementation
Start with one asset class, unit, or turnaround. Import the register, configure workflows in metadata, and go live in days.
Delivery path
Each rollout follows four structured stages led by our Professional Services team.
intelliVISION · CFIHOS & ISO 14224
Load your facility hierarchy, equipment tags, corrosion circuits, and historical CML readings via Excel workbook mapping or the Integration Hub, with deduplication and preview validation before commit.
Forms · Turnaround templates · Approval gates
Map inspection wizards (API 510, 570, 653), damage mechanisms, coating ITP hold points, and turnaround project templates in JSON metadata. No custom code or developer sprint is required.
524 RBAC permissions · intelliCREW · intelliEDGE
Bind users and API keys to roles and hierarchy data scopes, load inspector qualifications and calibrated gauge serials, and verify 30-day offline package checkout in intelliEDGE.
Production rollout · Admin self-service
Launch on your first unit, tank farm, or turnaround campaign. Your administrators add fields, templates, and budgetary plans directly in the workspace while intelliSPEC supports rollout and expansion.
Clear ownership
Answers
Forms, inspection wizards, turnaround wall-chart stages, dashboards, and approval chains are defined in declarative metadata rather than custom code. Adding a field, a damage mechanism, or a hold point is a configuration change, not a software release.
No. Most operators start with one asset class, one process unit, or one upcoming turnaround. Because intelliVISION scopes data by facility and hierarchy node, additional units and sites come online progressively on the same tenant.
Legacy UT readings import into intelliNDT alongside the source system's prior rates. Engineers review short-term, long-term, and governing corrosion rates and tMin formulas in preview before the baseline is locked.
Yes. Tenant administrators can update form fields, conditional rules, project templates, budgetary plan rate cards, and language translations directly without opening a developer ticket.
Evaluation path