Industry

Five nines rests on a diesel engine starting in ten seconds. Prove it starts. On the record.

intelliSPEC gives critical facility teams one signed record for every generator run, fuel test, and fire inspection, from a single colo hall to a portfolio across three continents. When the outage or the auditor arrives, the proof already exists.

10 secNFPA 110 Type 10 start, proven every test
96 hrfuel autonomy, tracked tank by tank
EN 50600one operations record, every region

Sector record

Outages and failed audits share a root cause.

Tests that ran but were never provable. Four modules hold the line where data centers actually break, and each one names its standard.

0110 sec NFPA 110 Type 10 start, proven every test
0296 hr fuel autonomy, tracked tank by tank
03EN 50600 one operations record, every region
NFPA 110 · 75 · 70EUPTIME · SOC 2

Where uptime is won

Outages and failed audits share a root cause.

Tests that ran but were never provable. Four modules hold the line where data centers actually break, and each one names its standard.

Data Centers · 01

Generator rounds that prove the start

Weekly runs, monthly load tests, and ATS transfer checks captured on guided wizards at the yard, offline if the hall is dark, signed before the technician walks away.

Data Centers · 02

96 hours of fuel, measured not claimed

UT thickness on day tanks and bulk storage with corrosion rate and remaining life per tank, so 96 hours of autonomy is a measured fact, not a nameplate claim.

Data Centers · 03

Every penetration closed with proof

Fire-rated construction and firestop surveyed penetration by penetration, so every cable pull that breaches a wall closes with photographic evidence.

Data Centers · 04

Energized work on one audit trail

Permits, arc flash JSAs, and LOTO for switchgear work on one audit trail that feeds Uptime Institute and SOC 2 evidence requests directly.

The working record

From the 2 a.m. load test to the auditor's desk.

One record follows the asset from the generator yard to the evidence export. Nothing is retyped, nothing is reconstructed.

01

Capture at the yard

A technician runs the weekly NFPA 110 test at 2 a.m. and logs transfer time, coolant temperature, and fuel level on a tablet, no network required. The record syncs signed when the device does.

02

The verdict

A slow ATS transfer or a thin tank wall reading recomputes the asset's standing on the spot. Run, repair, or replace routes to a named owner with a due date, not to a spreadsheet.

03

The proof

When Uptime Institute M&O assessors or the AHJ sample a year of emergency power history, the export is one query. Every entry carries user, timestamp, and signature.

Proof path

The next grid event is already on its way. So is the next audit.

Bring one site's emergency power program and we will show you the record both of them will find.

01

NFPA 110 generator, ATS, and battery test records signed and timestamped in intelliINSPECT.

02

STI SP001 tank inspections with UT corrosion rates and remaining life computed in intelliNDT.

03

NFPA 70E energized work and LOTO on one intelliCOMPLY audit trail, aligned to EN 50600 operations documentation.

See intelliINSPECT

Answers

Data Centers questions

Does intelliSPEC support NFPA 110 generator testing and inspection records?

Yes. Weekly runs, monthly load tests, ATS transfer times, and battery and charger checks are captured as structured, signed records against NFPA 110. Missed or overdue tests surface per generator before the AHJ finds them.

What software do data centers use to manage diesel fuel quality and tank integrity?

Critical facility teams use intelliSPEC to log ASTM D975 fuel sampling and polishing results in intelliINSPECT and to run STI SP001 tank inspections with UT thickness data in intelliNDT. Corrosion rate and remaining life are computed per tank, so stated fuel autonomy stays real.

How do data center fire protection inspections work in intelliSPEC?

Detection, clean agent, and suppression testing is scheduled and recorded to NFPA 75 and NFPA 25 intervals. intelliFIRE tracks fire barrier and firestop surveys so a breached wall never stays open quietly.

Can intelliSPEC help with an Uptime Institute M&O assessment or SOC 2 audit?

Both reviews sample maintenance and operations evidence. intelliSPEC holds the signed test, inspection, and corrective action history assessors ask for, exportable as one query instead of a week of assembly. The verdict stays with the assessor, the evidence is ready either way.

Does intelliSPEC support EN 50600 and ISO/IEC 22237 operations documentation?

Yes. The maintenance and inspection records EN 50600-3-1 expects for European facilities live on the same thread as NFPA records for US sites, so one portfolio runs one documentation standard worldwide.

How does intelliSPEC handle NFPA 70E electrical safety in a data center?

intelliCOMPLY issues energized work permits, arc flash JSAs, and LOTO against NFPA 70E, tied to the specific switchgear asset. Every authorization and closeout lands on the same audit trail as the inspection record.

Does it work offline during commissioning or in a powered-down hall?

Yes. intelliINSPECT captures full inspection records with photos and signatures on a device with no connectivity and syncs when the network returns. Level 4 and Level 5 commissioning tests at a new build are captured the same way as day two operations.